A delay on make relay delays the load from which of the following?

Prepare for the NATE Air Conditioning Service Certification Test with detailed questions and expert explanations. Ace your exam with comprehensive flashcards and multiple choice formats. Boost your confidence and expertise today!

A delay on make relay is designed to introduce a time lag before the load is energized after a triggering event occurs. This is useful in many HVAC applications, as it helps in sequencing the operation of equipment, allowing for proper system start-up procedures and preventing issues such as inrush current.

When the relay is activated, it will not immediately energize the load, but instead, it waits for a predefined time period before doing so. This characteristic ensures that the system has stabilized or that other components have had the necessary time to reach operational readiness.

In this context, the correct answer relates specifically to the fixed time period during which the relay does not energize the load after the cycle has started, thus ensuring that the system operates efficiently and safely.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy